Please use this identifier to cite or link to this item:
https://scholarbank.nus.edu.sg/handle/10635/14932
Title: | Heuristic rescheduling for managing abnormal refinery supply chain events | Authors: | ARIEF ADHITYA | Keywords: | Risk Management, Optimization, Reactive Scheduling, Uncertainty, Crude Oil, Disruption Management | Issue Date: | 25-Aug-2005 | Citation: | ARIEF ADHITYA (2005-08-25). Heuristic rescheduling for managing abnormal refinery supply chain events. ScholarBank@NUS Repository. | Abstract: | Todaya??s many uncertainties require that, for sustainable operations, supply chains be resilient and nimble while reacting to disruptions. We look at a refinery supply chain where disruptions such as crude arrival delay could make the current schedule infeasible; so rescheduling of operations is important. Refinery scheduling for a real world industrial size problem typically requires a significantly large amount of time to generate an optimal schedule. We present a strategy for recovering from disruptions by heuristic rescheduling. The main ideas of our method are breaking down the schedule into operation blocks and preserving the blocks in the schedule as far as possible. The major advantages of our method are greatly reduced computation time, minimum change in handling disruptions as compared to total rescheduling, and multiple proposed schedules. A second method which is model-based is proposed to overcome the shortcomings of the first heuristic-based method. The model-based method is more general, flexible, and complete than the heuristic method. The capabilities of the proposed methods are illustrated with several case studies. | URI: | http://scholarbank.nus.edu.sg/handle/10635/14932 |
Appears in Collections: | Master's Theses (Open) |
Show full item record
Files in This Item:
File | Description | Size | Format | Access Settings | Version | |
---|---|---|---|---|---|---|
a2_Cover Page.pdf | 6.26 kB | Adobe PDF | OPEN | None | View/Download | |
a3_Title Page.pdf | 7.13 kB | Adobe PDF | OPEN | None | View/Download | |
a4_Dedication Page.pdf | 6.45 kB | Adobe PDF | OPEN | None | View/Download | |
b1_page i_Acknowledgements.pdf | 7.91 kB | Adobe PDF | OPEN | None | View/Download | |
b2_page ii-iv_Table of Contents.pdf | 11.52 kB | Adobe PDF | OPEN | None | View/Download | |
b3_page v-vi_Summary.pdf | 12.25 kB | Adobe PDF | OPEN | None | View/Download | |
b4_page vii_List of Figures.pdf | 7.61 kB | Adobe PDF | OPEN | None | View/Download | |
b5_page viii-ix_List of Tables.pdf | 11.16 kB | Adobe PDF | OPEN | None | View/Download | |
c1_page 1-4_Chapter 1_Introduction.pdf | 17.03 kB | Adobe PDF | OPEN | None | View/Download | |
c2_page 5-20_Chapter 2_Literature Review.pdf | 152.84 kB | Adobe PDF | OPEN | None | View/Download | |
c3_page 21-27_Chapter 3_Problem Description.pdf | 149 kB | Adobe PDF | OPEN | None | View/Download | |
c4_page 28-58_Chapter 4_Heuristic-based Rescheduling Strategy.pdf | 512.6 kB | Adobe PDF | OPEN | None | View/Download | |
c5_page 59-102_Chapter 5_Model-based Rescheduling Strategy.pdf | 425.71 kB | Adobe PDF | OPEN | None | View/Download | |
c6_page 103-105_Chapter 6_Conclusions and Recommendations.pdf | 14.59 kB | Adobe PDF | OPEN | None | View/Download | |
d1_page 106-110_References.pdf | 19.34 kB | Adobe PDF | OPEN | None | View/Download |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.