Please use this identifier to cite or link to this item:
https://doi.org/10.1016/j.ejor.2003.04.001
Title: | Single item lot-sizing problems with backlogging on a single machine at a finite production rate | Authors: | Song, Y. Chan, G.H. |
Keywords: | Backlogging Finite production rate Lot-sizing Production scheduling |
Issue Date: | 16-Feb-2005 | Citation: | Song, Y., Chan, G.H. (2005-02-16). Single item lot-sizing problems with backlogging on a single machine at a finite production rate. European Journal of Operational Research 161 (1) : 191-202. ScholarBank@NUS Repository. https://doi.org/10.1016/j.ejor.2003.04.001 | Abstract: | In this paper we consider a single item lot-sizing problem with backlogging on a single machine at a finite production rate. The objective is to minimize the total cost of setup, stockholding and backlogging to satisfy a sequence of discrete demands. Both varying demands over a finite planning horizon and fixed demands at regular intervals over an infinite planning horizon are considered. We have characterized the structure of an optimal production schedule for both cases. As a consequence of this characterization, a dynamic programming algorithm is proposed for the computation of an optimal production schedule for the varying demands case and a simpler one for the fixed demands case. © 2003 Elsevier B.V. All rights reserved. | Source Title: | European Journal of Operational Research | URI: | http://scholarbank.nus.edu.sg/handle/10635/104627 | ISSN: | 03772217 | DOI: | 10.1016/j.ejor.2003.04.001 |
Appears in Collections: | Staff Publications |
Show full item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.