Full Name
Iftekhar A Karimi
Variants
Karimi, I.A.
Karimi, I.
A. Karimi, I.
Karimi, Iftekhar Abubakar
Karimi, I. A.
 
 
 
Email
cheiak@nus.edu.sg
 

Refined By:
Department:  COLLEGE OF DESIGN AND ENGINEERING
Date Issued:  2007

Results 1-17 of 17 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
1May-2007A model-based rescheduling framework for managing abnormal supply chain eventsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2Jul-2007A novel CDU model for refinery planningLi, W.; Hui, C.-W.; Karimi, I.A. ; Srinivasan, R. 
32007Asset management in and redesign of chemical supply chainsNaraharisetti, P.K.; Karimi, I.A. ; Srinivasan, R.; Wang, D.
4Feb-2007Heuristic rescheduling of crude oil operations to manage abnormal supply chain eventsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
52007Identifying synergistically switching pathways for multi-product strain improvement using multiobjective flux balance analysisSelvarasu, S.; Lee, D.-Y. ; A. Karimi, I. 
6Oct-2007Improving the robustness and efficiency of crude scheduling algorithmsLi, J. ; Li, W. ; Karimi, I.A. ; Srinivasan, R. 
72007Measures and approaches for a priori analysis of schedule robustnessKarri, B.; Srinivasan, R. ; Karimi, I.A. 
82007Modeling and simulation of main cryogenic heat exchanger in a base-load liquefied natural gas plantFaruque Hasan, M. ; Karimi, I.A. ; Alfadala, H.; Grootjans, H.
9Dec-2007Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel unitsLiu, Y.; Karimi, I.A. 
10Dec-2007Novel continuous-time formulations for scheduling multi-stage batch plants with identical parallel unitsLiu, Y.; Karimi, I.A. 
1126-Sep-2007Optimal contract selection for the global supply and distribution of raw materialsBansal, M. ; Karimi, I.A. ; Srinivasan, R. 
1226-Sep-2007Optimal contract selection for the global supply and distribution of raw materialsBansal, M. ; Karimi, I.A. ; Srinivasan, R. 
132007Optimal supply chain redesign using genetic algorithmKumar Naraharisetti, P.; A. Karimi, I. ; Srinivasana, R. 
14Mar-2007Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storageLiu, Y.; Karimi, I.A. 
15Mar-2007Scheduling multistage, multiproduct batch plants with nonidentical parallel units and unlimited intermediate storageLiu, Y.; Karimi, I.A. 
16Mar-2007Spinning wave motion in frontal polymerizationInamdar, S.R.; Pujari, N.S.; Karimi, I.A. ; Ponrathnam, S.; Tayal, R.K.; Kulkarni, B.D.
17Mar-2007Spinning wave motion in frontal polymerizationInamdar, S.R.; Pujari, N.S.; Karimi, I.A. ; Ponrathnam, S.; Tayal, R.K.; Kulkarni, B.D.