Please use this identifier to cite or link to this item:
https://doi.org/10.1061/(ASCE)0887-3801(2002)16:3(165)
DC Field | Value | |
---|---|---|
dc.title | Production scheduling for precast plants using a flow shop sequencing model | |
dc.contributor.author | Chan, W.T. | |
dc.contributor.author | Hu, H. | |
dc.date.accessioned | 2014-06-17T08:23:26Z | |
dc.date.available | 2014-06-17T08:23:26Z | |
dc.date.issued | 2002-07 | |
dc.identifier.citation | Chan, W.T., Hu, H. (2002-07). Production scheduling for precast plants using a flow shop sequencing model. Journal of Computing in Civil Engineering 16 (3) : 165-174. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)0887-3801(2002)16:3(165) | |
dc.identifier.issn | 08873801 | |
dc.identifier.uri | http://scholarbank.nus.edu.sg/handle/10635/66030 | |
dc.description.abstract | There are two alternatives for production organization in precast factories - namely, the comprehensive method and the specialized method. Production scheduling under the specialized alternative has been found to be a difficult optimization problem if heterogeneous elements are involved. A flow shop sequencing model that incorporates actual constraints encountered in practice is proposed for this difficult case of precast production scheduling. The model is solved using a genetic algorithm (GA). The traditional minimize makespan and the more practical minimize tardiness penalty objective functions are optimized separately, as well as simultaneously using a normalized weighted GA. Comparisons between the GA and classical heuristic rules show that the GA can obtain good schedules for the model, giving a family of solutions that are at least as good as those produced by the use of heuristic rules. © ASCE,. | |
dc.description.uri | http://libproxy1.nus.edu.sg/login?url=http://dx.doi.org/10.1061/(ASCE)0887-3801(2002)16:3(165) | |
dc.source | Scopus | |
dc.subject | Algorithms | |
dc.subject | Concrete, precast | |
dc.subject | Management methods | |
dc.subject | Manufacturing facilities | |
dc.subject | Productivity | |
dc.subject | Scheduling | |
dc.type | Article | |
dc.contributor.department | CIVIL ENGINEERING | |
dc.description.doi | 10.1061/(ASCE)0887-3801(2002)16:3(165) | |
dc.description.sourcetitle | Journal of Computing in Civil Engineering | |
dc.description.volume | 16 | |
dc.description.issue | 3 | |
dc.description.page | 165-174 | |
dc.description.coden | JCCEE | |
dc.identifier.isiut | 000176288000002 | |
Appears in Collections: | Staff Publications |
Show simple item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.