Please use this identifier to cite or link to this item: https://doi.org/10.1080/00207543.2011.551844
DC FieldValue
dc.titleIncreasing production rate in Kanban controlled assembly lines through preventive maintenance
dc.contributor.authorRuifeng, C.
dc.contributor.authorSubramaniam, V.
dc.date.accessioned2014-06-17T06:24:08Z
dc.date.available2014-06-17T06:24:08Z
dc.date.issued2012-02-15
dc.identifier.citationRuifeng, C., Subramaniam, V. (2012-02-15). Increasing production rate in Kanban controlled assembly lines through preventive maintenance. International Journal of Production Research 50 (4) : 991-1008. ScholarBank@NUS Repository. https://doi.org/10.1080/00207543.2011.551844
dc.identifier.issn00207543
dc.identifier.urihttp://scholarbank.nus.edu.sg/handle/10635/60516
dc.description.abstractPreventive maintenance is widely implemented in manufacturing industries for reducing random machine failures. High availability of a machine may be ensured by avoiding excessive or insufficient maintenance. Although analytical models of single or two-machine systems with preventive maintenance have been proposed in the literature, similar study on multi-machine systems remains limited. In this paper, the authors investigate preventive maintenance in Kanban controlled assembly lines and develop an analytical model for such systems. This model decomposes an assembly line into a series of primitive line segments. Each segment is characterised by a continuous-time-discrete-state Markov process. This model provides the estimates of production rate and work-in-process, which can be used to evaluate the effect of preventive maintenance on an assembly line. Additionally, based on the proposed model, we also present an algorithm to determine the maintenance rates for all machines in a Kanban controlled assembly line. As demonstrated in the numerical experiments, the analytical model is useful to manufacturers in preventing excessive or insufficient maintenance and thus improving the production rate of Kanban controlled assembly lines. © 2012 Taylor & Francis.
dc.description.urihttp://libproxy1.nus.edu.sg/login?url=http://dx.doi.org/10.1080/00207543.2011.551844
dc.sourceScopus
dc.subjectassembly line
dc.subjectdecomposition
dc.subjectKanban
dc.subjectMarkov
dc.subjectpreventive maintenance
dc.subjectunreliable machine
dc.typeArticle
dc.contributor.departmentMECHANICAL ENGINEERING
dc.description.doi10.1080/00207543.2011.551844
dc.description.sourcetitleInternational Journal of Production Research
dc.description.volume50
dc.description.issue4
dc.description.page991-1008
dc.description.codenIJPRB
dc.identifier.isiut000303584500005
Appears in Collections:Staff Publications

Show simple item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.