Title: A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
Authors: Brah, S.A. 
Keywords: Flexible flow lines
Flow shop with multiple processors
Scheduling
Tardiness
Issue Date: 1996
Citation: Brah, S.A. (1996). A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors. Production Planning and Control 7 (4) : 362-373. ScholarBank@NUS Repository.
Abstract: The literature on job scheduling recognizes the importance of due date performance criteria such as mean tardiness and maximum tardiness. A number of studies test a large number of sequencing rules for these criteria in job shop and flow shop settings. The object of this present research is to examine the performance of some well-known priority rules in a flow shop with multiple processors. This study investigates the performance of ten priority rules in terms of mean and maximum tardiness. It examines the effects of problem characteristics, such as number of jobs, number of machines stages and number of parallel processors at each stage, and the performance of priority rules using regression analysis. The findings of the study suggest that the primary determinants of tardiness-based criteria are problem characteristics. In addition, both the regression analysis and the analysis of variance provide strong evidence of the strategy-effect. Finally, a detailed performance review of examined priority rules for various problem characteristics is presented.
Source Title: Production Planning and Control
URI: http://scholarbank.nus.edu.sg/handle/10635/45048
ISSN: 09537287
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.