dc.titleINVESTIGATING AND COMPARING SCHEDULE PERFORMANCE OF NEW AND RETROFITTING GREEN BUILDING CONSTRUCTION PROJECTS
dc.contributor.authorTAN LAY GHIM LENE
dc.date.accessioned2013-04-01T02:10:20Z
dc.date.accessioned2022-04-22T18:07:14Z
dc.date.available2019-09-26T14:14:06Z
dc.date.available2022-04-22T18:07:14Z
dc.date.issued2013-04-01
dc.identifier.citationTAN LAY GHIM LENE (2013-04-01). INVESTIGATING AND COMPARING SCHEDULE PERFORMANCE OF NEW AND RETROFITTING GREEN BUILDING CONSTRUCTION PROJECTS. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/222444
dc.description.abstractBeing a small city with relatively large population, Singapore is moving towards a sustainable development that puts large attention on green building construction projects. As green building industry continues to affluent, it is vital to ensure that green building project meets its completion date without any delay. However, limited research has been conducted to analyze the project schedule performance of both new and retrofitting green building construction projects. Therefore, this study aims to examine the time differences between new and retrofitting green building construction projects and identify the common delay factors encountered for these two types of building projects. Ultimately, building onto the research findings, solutions are proposed to improve the schedule performance for both new and retrofitting green building construction projects. The research is developed through pervasive literature review, survey questionnaires and face-to-face interview carried out with the construction professionals. Thirty-six identified delay factor elements from various literatures, which are grouped into eight factor categories, were scrutinized to determine its impact on new and retrofitting green building project schedule performance. The common top three important factor elements which pose the greatest impact on project schedule delay for both new and retrofitting green building construction projects are ‘consultant cooperation to solve problem’, ‘Late delivery of material’, and ‘ unfavourable site conditions’. The findings revealed that retrofitting projects indeed will experience a higher probability of delay as compared to new green building construction projects. It was observed that 22.90% of the new green building construction projects were delayed while 31.13% of retrofitting green building construction projects were completed behind schedule. Further analysis shows that the design development, and the planning and feasibility studies of the construction project phase were found to be the most culpable for the extended period of project duration for both new and retrofitting green building construction projects. A list of recommendations would then be proposed to improve the schedule performance of new and retrofitting green building construction projects. Following, this study establishes a basis for further research on the enhancement of future new and retrofitting green building project schedule in the local context.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/2171
dc.subjectBuilding
dc.subjectProject and Facilities Management
dc.subjectHwang Bon Gang
dc.subject2012/2013 PFM
dc.subjectPFM
dc.typeDissertation
dc.contributor.departmentBUILDING
dc.contributor.supervisorHWANG BON GANG
dc.description.degreeBachelor's
dc.description.degreeconferredBACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT)
dc.embargo.terms2013-04-02
Appears in Collections:Bachelor's Theses

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Tan Lay Ghim Lene 2012-2013.pdf1.63 MBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.