Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/221999
DC FieldValue
dc.titleMeasuring the Impact of Building Information Modeling on Rework
dc.contributor.authorKAY WEI YANG
dc.date.accessioned2017-06-08T01:15:21Z
dc.date.accessioned2022-04-22T17:54:26Z
dc.date.available2019-09-26T14:14:03Z
dc.date.available2022-04-22T17:54:26Z
dc.date.issued2017-06-08
dc.identifier.citationKAY WEI YANG (2017-06-08). Measuring the Impact of Building Information Modeling on Rework. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/221999
dc.description.abstractRework is a major factor affecting the productivity in the Singapore construction industry. In an attempt to improve the productivity of the Singapore construction industry, one of the measures by the Singapore government was to promote the usage of Building Information Modeling (BIM) by mandating BIM e-submission for architectural and engineering plans for approval. However, even with such efforts made by the government, the construction industry has yet to exploit the full potential of BIM. Hence, it is important for organization to know the impact of BIM on rework so as to allow them to realize the potential benefits that BIM can bring about to the project. Through literature review, eight sources of rework were identified and the impact of BIM on the rework time and cost were quantified for each of these sources of rework. The result of the analysis shows that BIM is able to reduce rework arising from Owner Change, Design Error, Design Change, Constructor’s Error and Constructor’s Change. In addition, eight key strategies to effectively utilize BIM to reduce rework were identified, and the top four strategies will be discussed in detail. Based on the analysis, the top 4 strategies identified are “Use of BIM throughout Design and Construction Phase”, “Design Checks”, “Rework Tracking System” and “New Processes for BIM”. By quantifying rework cost and allowing industry experts to gain a better understanding on rework and BIM, it will allow industry experts to know the importance of reducing rework and the strategies to effective utilization of BIM to reduce rework, thus improving the overall productivity of Singapore construction industry.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/3807
dc.subjectBuilding
dc.subjectPFM
dc.subjectProject and Facilities Management
dc.subjectHwang Bon Gang
dc.subject2016/2017 PFM
dc.subjectBuilding Information Modeling (BIM)
dc.subjectEffectiveness
dc.subjectRework
dc.subjectSource of Rework
dc.typeDissertation
dc.contributor.departmentBUILDING
dc.contributor.supervisorHWANG BON GANG
dc.description.degreeBachelor's
dc.description.degreeconferredBACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT)
dc.embargo.terms2017-06-10
Appears in Collections:Bachelor's Theses

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Kay Wei Yang 2016-2017.pdf720.4 kBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.