Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/221981
DC FieldValue
dc.titleIDENTIFICATION OF POTENTIAL RISK VARIABLES IN IMPLEMENTATION OF VALUE MANAGEMENT
dc.contributor.authorONG SHI YING
dc.date.accessioned2012-12-27T08:00:41Z
dc.date.accessioned2022-04-22T17:54:00Z
dc.date.available2019-09-26T14:14:03Z
dc.date.available2022-04-22T17:54:00Z
dc.date.issued2012-12-27
dc.identifier.citationONG SHI YING (2012-12-27). IDENTIFICATION OF POTENTIAL RISK VARIABLES IN IMPLEMENTATION OF VALUE MANAGEMENT. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/221981
dc.description.abstractAchieving client satisfaction is being identified as one of the most significant elements in today’s construction industry. With the evaluation of globalisation, Singapore’s construction industry has been constantly working towards the aim of satisfying the clients’ needs and expectations. As such, value management is identified as a key fundamental tool in achieving client satisfaction. However, studies have shown that enhancing value often associate with potential risk variables. It is a prevalent problem and studies have shown that if such risk variables are not being managed properly, it will affect the overall project performances of construction projects. Analysing the survey data obtained from 50 companies, this research aims to explore the potential risk variables in value management and assess the correlation of the different types of risk variables occurred in each of the value job phase. Potential risk variables are identified in the six different phases of value job plan. However, majority of the local firms fail to achieve the best coordination upon implementation of value risk management (VRM). Common risk variables such as inadequate experience in value management and delay in approvals are being identified. These factors are registered as major factors contributing to the barriers of value risk management. Furthermore, it identifies the current status of value risk management in the Singapore construction industry. The results of this study established that the concept and application of VRM was believed to be still in a premature stage in Singapore. The identification of potential risk variables in value management and the integration between the two methodologies as a common tool can aid in achieving a better project performances.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/2151
dc.subjectBuilding
dc.subjectPFM
dc.subjectProject and Facilities Management
dc.subjectHwang Bon Gang
dc.subject2012/2013 PFM
dc.subjectValue management
dc.typeDissertation
dc.contributor.departmentBUILDING
dc.contributor.supervisorHWANG BON GANG
dc.description.degreeBachelor's
dc.description.degreeconferredBACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT)
dc.embargo.terms2012-12-31
Appears in Collections:Bachelor's Theses

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Ong Shi Ying 2012-2013.pdf1.78 MBAdobe PDF

RESTRICTED

NoneLog In

Page view(s)

10
checked on Jan 26, 2023

Download(s)

4
checked on Jan 26, 2023

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.