Please use this identifier to cite or link to this item:
https://scholarbank.nus.edu.sg/handle/10635/221819
DC Field | Value | |
---|---|---|
dc.title | FACTORS INFLUENCING VARIATIONS OF PRIVATE PROJECTS IN SINGAPORE | |
dc.contributor.author | ZHAO NA | |
dc.date.accessioned | 2010-06-03T06:40:09Z | |
dc.date.accessioned | 2022-04-22T17:49:19Z | |
dc.date.available | 2019-09-26T14:14:02Z | |
dc.date.available | 2022-04-22T17:49:19Z | |
dc.date.issued | 2010-06-03T06:40:09Z | |
dc.identifier.citation | ZHAO NA (2010-06-03T06:40:09Z). FACTORS INFLUENCING VARIATIONS OF PRIVATE PROJECTS IN SINGAPORE. ScholarBank@NUS Repository. | |
dc.identifier.uri | https://scholarbank.nus.edu.sg/handle/10635/221819 | |
dc.description.abstract | Variations are often inevitable for construction projects such as cost and time overruns or disputes. In this study, the author attempts to identify and evaluate the factors influencing their occurrence. Apart from that, practical recommendations on reducing variations are also proposed by gathering industry practitioners’ opinions on mitigation of variation cost. This will lead to better management and control of the items and finally mitigate the adverse effects arising from variations. Firstly, three hypotheses are established to provide theoretical assumptions for this study. The author assumes that firstly, client characteristics, namely, profile of client; secondly, project characteristics, namely, type of facility, type of project, contract sum and construction duration; thirdly, project organization, namely, procurement method, contractor selection methods, the number of subcontractors involved and pre-contract design duration have significant influence on the total variations cost. The evaluation was based on the correlational analysis of 42 completed buildings projects in Singapore. The findings suggest that project characteristics have significant influence on total variation cost. | |
dc.language.iso | en | |
dc.source | https://lib.sde.nus.edu.sg/dspace/handle/sde/1228 | |
dc.subject | Building | |
dc.subject | Project and Facilities Management | |
dc.subject | Variation cost | |
dc.type | Dissertation | |
dc.contributor.department | BUILDING | |
dc.contributor.supervisor | GOH BEE HUA | |
dc.description.degree | Bachelor's | |
dc.description.degreeconferred | BACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT) | |
Appears in Collections: | Bachelor's Theses |
Show simple item record
Files in This Item:
File | Description | Size | Format | Access Settings | Version | |
---|---|---|---|---|---|---|
Zhao Na 2009-2010.pdf | 386.97 kB | Adobe PDF | RESTRICTED | None | Log In |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.