Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/221716
DC FieldValue
dc.titleTHE IMPACT OF BUILDING INFORMATION MODELING (BIM) ON THE JOB RESPONSIBILITIES OF THE QUANTITY SURVEYOR
dc.contributor.authorWONG KUAN WEI
dc.date.accessioned2012-06-08T07:37:17Z
dc.date.accessioned2022-04-22T17:46:31Z
dc.date.available2019-09-26T14:14:02Z
dc.date.available2022-04-22T17:46:31Z
dc.date.issued2012-06-08
dc.identifier.citationWONG KUAN WEI (2012-06-08). THE IMPACT OF BUILDING INFORMATION MODELING (BIM) ON THE JOB RESPONSIBILITIES OF THE QUANTITY SURVEYOR. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/221716
dc.description.abstractBuilding Information Modeling (BIM) for the construction industry is developed to reduce the fragmentation and enhance the level of collaboration and cooperation between the different stakeholders in the project. In order to improve the productivity of the construction industry, the direction of the government is to fully implement BIM eSubmission for all Architectural and Engineering projects. The implementation of BIM has initiated changes to the job scope of the architect and engineers, who involved at early stages of the project. It is important to understand and recommend changes to the job scope of the Quantity Surveyors (QS), who are involved at the later stages of the project. This study focuses on examining the impact of BIM on the job scope of the QS and the introduction of the Central Data Repository (CDR), Total Cost Management (TCM) and BIM Model Checking Software (BMCS) to complement BIM. Literature reviews and questionnaire were used for this study to gather data and information. The questionnaires were sent out to SISV-registered QS and 48 sets of responses were collected. Significance tests were performed for the CDR, TCM and BMCS and found to have a significant impact on the job scope. The Pearson’s Correlation was used to examine the relationship between CDR, TCM and BMCS with the job scope at different stages of the project. Multiple regression analysis is done to develop a model to incorporate the CDR, TCM and BMCS into the job scope. The relatively low number of responses and lack of completed BIM projects for QS constituted to the limitation of this study. Factors are identified in priority of importance for the QS to adopt BIM and incorporate into their job scope.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/2000
dc.subjectBuilding
dc.subjectProject and Facilities Management
dc.subjectTeo Ai Lin Evelyn
dc.subject2011/2012 PFM
dc.subjectBIM model checking software (BMCS)
dc.subjectBuilding information modeling (BIM)
dc.subjectCentral data repository (CDR)
dc.subjectQuantity surveyor
dc.subjectTotal cost management (TCM)
dc.typeDissertation
dc.contributor.departmentBUILDING
dc.contributor.supervisorTEO AI LIN EVELYN
dc.description.degreeBachelor's
dc.description.degreeconferredBACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT)
dc.embargo.terms2012-07-01
Appears in Collections:Bachelor's Theses

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Wong Kuan Wei 2011-2012.pdf2.35 MBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.