Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/221320
DC FieldValue
dc.titleRISK IDENTIFICATION AND ALLOCATION IN UNDERGROUND RAIL CONSTRUCTION JOINT VENTURES IN SINGAPORE
dc.contributor.authorYU SHIYUN GWENDOLYN
dc.date.accessioned2012-06-26T06:34:54Z
dc.date.accessioned2022-04-22T17:34:42Z
dc.date.available2019-09-26T14:14:00Z
dc.date.available2022-04-22T17:34:42Z
dc.date.issued2012-06-26
dc.identifier.citationYU SHIYUN GWENDOLYN (2012-06-26). RISK IDENTIFICATION AND ALLOCATION IN UNDERGROUND RAIL CONSTRUCTION JOINT VENTURES IN SINGAPORE. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/221320
dc.description.abstractThe Singapore government first initiated the preferential margin scheme (PMS) in the 1980s to encourage foreign firms to form international construction joint ventures (ICJVs) with local contractors. This was to allow indigenous contractors to bid for public sector projects and depend less on their foreign counterparts. At that time, ICJVs were mainly formed for the construction of underground Mass Rapid Transit (MRT) projects. Although PMS was later scrapped, the formation of ICJVs to bid for such projects still continued. This study aims to explore the risk allocation process through identification of risk factors in underground rail ICJV projects. A survey was conducted to explore the criticality of the risk groups and preferred risk allocation strategies from foreign and local contractors. Respondents were also requested to rank the importance of risk allocation obstacles encountered based on a five-point Likert scale to investigate how the risk allocation process can be further enhanced. The results establish that there were strong associations between local and foreign firms in regards to the attractive and negative factors as well as the risks in ICJVs. Respondents placed emphasis on the management of the relationship between partners instead of the project management itself. However, it was found that the main problem foreign contractors encountered was the differences in culture and working styles while local contractors were more concerned with the unclear division of responsibilities. With these results, it is hoped that ICJV participants can better manage and cope with risks in future MRT construction projects. This study may serve as a guide for them on what to take note in risk management and enhance the risk allocation process in ICJVs. Since underground MRT construction will continue until 2020, the findings from this study would be useful for participants in identifying critical risks and the most efficient risk allocation framework in the early stages of project development.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/2075
dc.subjectBuilding
dc.subjectProject and Facilities Management
dc.subjectHwang Bon Gang
dc.subject2011/2012 PFM
dc.subjectPFM
dc.subjectJoint ventures
dc.subjectMRT
dc.subjectSingapore
dc.typeDissertation
dc.contributor.departmentBUILDING
dc.contributor.supervisorHWANG BON GANG
dc.description.degreeBachelor's
dc.description.degreeconferredBACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT)
dc.embargo.terms2012-07-01
Appears in Collections:Bachelor's Theses

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Yu Shiyun Gwendolyn 2011-2012.pdf534.29 kBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.