dc.title | INADEQUACY OF CURRENT CONTRACTUAL FORMULA IN RESOLVING DISPUTES OVER VALUATION OF VARIATION | |
dc.contributor.author | GAN JIA HUI DAPHNE | |
dc.date.accessioned | 2017-06-05T02:52:07Z | |
dc.date.accessioned | 2022-04-22T17:33:00Z | |
dc.date.available | 2019-09-26T14:13:59Z | |
dc.date.available | 2022-04-22T17:33:00Z | |
dc.date.issued | 2017-06-05 | |
dc.identifier.citation | GAN JIA HUI DAPHNE (2017-06-05). INADEQUACY OF CURRENT CONTRACTUAL FORMULA IN RESOLVING DISPUTES OVER VALUATION OF VARIATION. ScholarBank@NUS Repository. | |
dc.identifier.uri | https://scholarbank.nus.edu.sg/handle/10635/221265 | |
dc.description.abstract | Variations are an inevitable aspect of a construction project but they can also be detrimental to the progress of the project. They can impact the time, cost and completion of the construction project. Therefore, variations need to be properly managed and administered through construction contracts. There are several aspect of variation disputes. This study looks into the most prevalent variation dispute which is the dispute over the valuation of variation. Considering how the cash flow is the lifeblood of every construction project, the valuation of variations if not properly carried out, can be damaging to the outcome of the project. If it is not handled efficiently, it can lead to inaccurate cost reconciliation or bad prediction of project profit. The study evaluates the adequacy of the existing contractual formulae in assisting to resolve the conflict of valuation through the use of case law. Case law is used to provide insights on how the Court proposed solutions to resolve the conflict between the parties over the valuation process. | |
dc.language.iso | en | |
dc.source | https://lib.sde.nus.edu.sg/dspace/handle/sde/3780 | |
dc.subject | Building | |
dc.subject | PFM | |
dc.subject | Project and Facilities Management | |
dc.subject | Chan Chuen Fye Philip | |
dc.subject | 2016/2017 PFM | |
dc.subject | Contract | |
dc.subject | Quantum Meruit | |
dc.subject | Valuation of Variation | |
dc.subject | Variation | |
dc.type | Dissertation | |
dc.contributor.department | BUILDING | |
dc.contributor.supervisor | CHAN CHUEN FYE PHILIP | |
dc.description.degree | Bachelor's | |
dc.description.degreeconferred | BACHELOR OF SCIENCE (PROJECT AND FACILITIES MANAGEMENT) | |
dc.embargo.terms | 2017-06-07 | |
Appears in Collections: | Bachelor's Theses |
Show simple item record
Files in This Item:
File | Description | Size | Format | Access Settings | Version | |
---|---|---|---|---|---|---|
Gan Jia Hui Daphne 2016-2017.pdf | 644.43 kB | Adobe PDF | RESTRICTED | None | Log In |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.