Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/220543
DC FieldValue
dc.titleFACTORS THAT AFFECT PROJECT PERFORMANCE IN CHINA BASED ON CASE STUDIES
dc.contributor.authorMIAO QINGQING
dc.date.accessioned2009-10-07T14:04:48Z
dc.date.accessioned2022-04-22T17:11:39Z
dc.date.available2019-09-26T14:13:56Z
dc.date.available2022-04-22T17:11:39Z
dc.date.issued2009-10-07T14:04:48Z
dc.identifier.citationMIAO QINGQING (2009-10-07T14:04:48Z). FACTORS THAT AFFECT PROJECT PERFORMANCE IN CHINA BASED ON CASE STUDIES. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/220543
dc.description.abstractChina’s construction industry is experiencing a boom. In 2006, the output value of construction sector was 4.098 trillion yuan RMB or SGD$ 820 billion, up 18.59 percent year-on-year. Nevertheless, project performance in China is still lagging in many ways. In order to achieve a satisfactory development of the Chinese construction industry, factors affecting project performance need to be examined. The objectives of this research are to: (1) evaluate project performance in terms of time, cost and quality; and (2) identify the factors that affect project performance in China. It is hypothesized that characteristics of the project, clients, consultants and contractors have an effect on the performance of projects. It is also hypothesized that project performance can be affected by the collaboration among different project key players. The research design was based on case study. Three in-depth case studies of projects performed in China were conducted. All the projects were owned, designed and constructed by Chinese firms. The method of data collection was mainly through face-to-face interviews. The findings show that characteristics of the project, clients, consultants, contractors and relationship among project team members affect project performance. Through case studies, a framework for achieving successful project performance in China is established based on the factors identified. The practicality and usefulness of this study is to make practitioners in the construction industry aware of the factors that may affect project performance in China.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/129
dc.subjectBuilding
dc.typeDissertation
dc.contributor.departmentBUILDING
dc.contributor.supervisorLING YEAN YNG FLORENCE
dc.description.degreeBachelor's
dc.description.degreeconferredBACHELOR OF SCIENCE (BUILDING)
Appears in Collections:Bachelor's Theses

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
MIAO QINGQING 2008-2009.pdf422.34 kBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.