Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/220109
DC FieldValue
dc.titleRE-THINKING JAKARTA PUBLIC TRANSPORT SYSTEM: A COMPARATIVE STUDY OF JAKARTA, INDONESIA AND CURITIBA, BRAZIL ON BUS RAPID TRANSIT SYSTEM
dc.contributor.authorARIE PRASETYO
dc.date.accessioned2014-10-23T09:57:52Z
dc.date.accessioned2022-04-22T15:52:58Z
dc.date.available2019-09-26T14:13:53Z
dc.date.available2022-04-22T15:52:58Z
dc.date.issued2014-10-23
dc.identifier.citationARIE PRASETYO (2014-10-23). RE-THINKING JAKARTA PUBLIC TRANSPORT SYSTEM: A COMPARATIVE STUDY OF JAKARTA, INDONESIA AND CURITIBA, BRAZIL ON BUS RAPID TRANSIT SYSTEM. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/220109
dc.description.abstractWith immediate population reached 9 million inhabitants, and extended metropolitan population around 23,6 million inhabitants, Jakarta, without any convenient and government full-controlled public transport, is looking for a solution of good public transport system. On 2004, under Governor Sutiyoso (1997-2004), State Government of Jakarta released an integrated plan for Jakarta future transport system. The plan is called Jakarta Mass Transit System (JMaTS). This plan combined multimodal transit systems including Bus Rapid Transit (BRT), Subway Train – Mass Rapid Transit (MRT), Monorail, and Waterways system. Bus Rapid Transit system (Jakarta’s BRT; also known as Jakarta’s Busway or Transjakarta) started to operate on February 2004. Currently, 7 corridors of Transjakarta are in operation, 3 corridors are under construction, and another 5 corridors are planned to be finished on 2015. By doing macro analysis of total 15 corridors that planned, this research observed that the efficiency of the system is low. It is found that the plan has shown some overlapping that causes inefficient payment, as government pays on kilometer-basis to private operators. The confusions came up from user point of view as the planned corridors became complicated. On the other hands, the planning of the system is not fully maximized on potential existing resources that Jakarta already had. The future integration of many modes of transport seemed to be too ambitious, without really considering the fact that Jakarta still have numbers of problem such as flood. This research paper is trying to re-think about Jakarta’s future transport system, by looking at the fact of Jakarta had some potential critical existing capital. The existing capitals are observed to be maximally used to improve system’s performance. The paper is to open up thoughts in all the stakeholders of an improvement opportunity based on the existing system – not a totally new build up system that often causes a problem. As it is based on the existing capitals that Jakarta has already had, this recommendations offers a potential in cost saving, as well as an easier implementation.
dc.language.isoen
dc.sourcehttps://lib.sde.nus.edu.sg/dspace/handle/sde/2784
dc.subjectArchitecture
dc.subjectUrban Design
dc.subjectUD
dc.subjectMaster
dc.subjectJohannes Widodo
dc.subject2007/2008 Aki MAUD
dc.subjectBusway
dc.subjectJakarta
dc.subjectTransport
dc.subjectTransjakarta
dc.typeDissertation
dc.contributor.departmentARCHITECTURE
dc.contributor.supervisorJOHANNES WIDODO
dc.description.degreeMaster's
dc.description.degreeconferredMASTER OF ARTS (URBAN DESIGN) (MAUD)
dc.embargo.terms2014-10-24
Appears in Collections:Master's Theses (Restricted)

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Arie Prasetyo 2007-2008.pdf11.52 MBAdobe PDF

RESTRICTED

NoneLog In

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.