Please use this identifier to cite or link to this item: https://scholarbank.nus.edu.sg/handle/10635/218202
DC FieldValue
dc.titleINTEGRATED SCHEDULING OF QUAYSIDE CRANES AND AUTO-GUIDED VEHICLES FOR QUAYSIDE OPERATION IN AUTOMATED CONTAINER TERMINALS
dc.contributor.authorCHEN ZHAOYU
dc.date.accessioned2022-03-31T18:00:27Z
dc.date.available2022-03-31T18:00:27Z
dc.date.issued2021-08-20
dc.identifier.citationCHEN ZHAOYU (2021-08-20). INTEGRATED SCHEDULING OF QUAYSIDE CRANES AND AUTO-GUIDED VEHICLES FOR QUAYSIDE OPERATION IN AUTOMATED CONTAINER TERMINALS. ScholarBank@NUS Repository.
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/218202
dc.description.abstractIn this study, the quayside operation in automated container terminals will be decomposed into multiple stages. A BPMFSS model is established for integrated scheduling for QCs and AGVs at quayside operation. A Sequential Heuristic solution method and a PSO-based solution method are proposed to solve this model.
dc.language.isoen
dc.subjectContainer terminal, crane, AGV, Scheduling
dc.typeThesis
dc.contributor.departmentINDUSTRIAL SYSTEMS ENGINEERING & MGT
dc.contributor.supervisorLee Loo Hay
dc.description.degreeMaster's
dc.description.degreeconferredMASTER OF ENGINEERING (FOE)
dc.identifier.orcid0000-0003-2875-7622
Appears in Collections:Master's Theses (Open)

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
Chen Zhaoyu Thesis (Final copy).pdf962.34 kBAdobe PDF

OPEN

NoneView/Download

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.