Please use this identifier to cite or link to this item: https://doi.org/10.1080/15623599.2018.1492664
DC FieldValue
dc.titleImproving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects
dc.contributor.authorBon-Gang Hwang
dc.contributor.authorPramesh Krishnankutty
dc.contributor.authorLei Zhu
dc.contributor.authorCarlos Caldas
dc.contributor.authorArjun Shounak
dc.contributor.authorStephen P. Mulva
dc.date.accessioned2020-09-16T07:17:20Z
dc.date.available2020-09-16T07:17:20Z
dc.date.issued2018-10-02
dc.identifier.citationBon-Gang Hwang, Pramesh Krishnankutty, Lei Zhu, Carlos Caldas, Arjun Shounak, Stephen P. Mulva (2018-10-02). Improving Labour Productivity in Process Construction Maintenance and Shutdown/Turnaround Projects. International Journal of Construction Management 20 (07) : 822-836. ScholarBank@NUS Repository. https://doi.org/10.1080/15623599.2018.1492664
dc.identifier.issn1562-3599
dc.identifier.urihttps://scholarbank.nus.edu.sg/handle/10635/176319
dc.publisherTaylor & Francis
dc.sourceTaylor & Francis
dc.typeArticle
dc.contributor.departmentBUILDING
dc.description.doi10.1080/15623599.2018.1492664
dc.description.sourcetitleInternational Journal of Construction Management
dc.description.volume20
dc.description.issue07
dc.description.page822-836
dc.published.statePublished
Appears in Collections:Elements
Staff Publications

Show simple item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
10.108015623599.2018.1492664.docx2.99 MBMicrosoft Word XML

OPEN

NoneView/Download

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.