Please use this identifier to cite or link to this item:
https://scholarbank.nus.edu.sg/handle/10635/158762
DC Field | Value | |
---|---|---|
dc.title | RESOURCE-INTERACTING SIMULATION IN CONSTRUCTION | |
dc.contributor.author | LI GUANGMING | |
dc.date.accessioned | 2019-09-16T02:37:38Z | |
dc.date.available | 2019-09-16T02:37:38Z | |
dc.date.issued | 2001 | |
dc.identifier.citation | LI GUANGMING (2001). RESOURCE-INTERACTING SIMULATION IN CONSTRUCTION. ScholarBank@NUS Repository. | |
dc.identifier.uri | https://scholarbank.nus.edu.sg/handle/10635/158762 | |
dc.source | CCK BATCHLOAD 20190911 | |
dc.subject | modeling methodology | |
dc.subject | simulation | |
dc.subject | construction management | |
dc.subject | object-oriented | |
dc.subject | resource | |
dc.type | Thesis | |
dc.contributor.department | CIVIL ENGINEERING | |
dc.contributor.supervisor | DAVID CHUA | |
dc.description.degree | Master's | |
dc.description.degreeconferred | MASTER OF ENGINEERING | |
Appears in Collections: | Master's Theses (Restricted) |
Show simple item record
Files in This Item:
File | Description | Size | Format | Access Settings | Version | |
---|---|---|---|---|---|---|
b22840916.PDF | 8.62 MB | Adobe PDF | RESTRICTED | None | Log In |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.