Full Name
Xie Min
(not current staff)
Variants
Min, X.
Xie, M.
 
 
 
Email
isexiem@nus.edu.sg
 

Refined By:
Subject:  Statistical process control

Results 1-20 of 20 (Search time: 0.007 seconds).

Issue DateTitleAuthor(s)
11998A comparative study of CCC and CUSUM chartsXie, M. ; Goh, T.N. ; Lu, X.S.
21999A quality monitoring and decision-making scheme for automated production processesXie, M. ; Lu, X.S.; Goh, T.N. ; Chan, L.Y.
31997A study of economic design of control charts for cumulative count of conforming itemsXie, M. ; Goh, T.N. ; Xie, W.
42001An integrated SPC approach for manufacturing processesXie, M. ; Goh, T.N. ; Cai, D.Q.
51999An investigation of the effects of inspection errors on the run-length control chartsLu, X.S.; Xie, M. ; Goh, T.N. 
6Oct-1998Computer-aided statistical monitoring of automated manufacturing processesXie, M. ; Goh, T.N. ; Lu, X.S.
721-Sep-2002Economic design of control chart for trended processesCai, D.Q.; Xie, M. ; Goh, T.N. ; Tang, X.Y.
8Jan-2009Integrated control chart system for time-between-events monitoring in a multistage manufacturing systemShamsuzzaman, M. ; Min, X. ; Ngee, G.T. ; Haiyun, Z.
9Jan-2009Integrated control chart system for time-between-events monitoring in a multistage manufacturing systemShamsuzzaman, M. ; Min, X. ; Ngee, G.T. ; Haiyun, Z.
1030-Jun-2001On economic design of cumulative count of conforming chartXie, M. ; Tang, X.Y.; Goh, T.N. 
1130-Jun-2001On economic design of cumulative count of conforming chartXie, M. ; Tang, X.Y.; Goh, T.N. 
12Oct-2002On the performance of geometric charts with estimated control limitsYang, Z.; Xie, M. ; Kuralmani, V. ; Tsui, K.-L.
13Oct-2002On the performance of geometric charts with estimated control limitsYang, Z.; Xie, M. ; Kuralmani, V. ; Tsui, K.-L.
14Mar-2003Optimal control limits for CCC charts in the presence of inspection errorsRanjan, P.; Xie, M. ; Goh, T.N. 
15Mar-2003Optimal control limits for CCC charts in the presence of inspection errorsRanjan, P.; Xie, M. ; Goh, T.N. 
161998Prioritizing processes in initial implementation of statistical process controlGoh, T.N. ; Xie, M. ; Xie, W.
171998Prioritizing processes in initial implementation of statistical process controlGoh, T.N. ; Xie, M. ; Xie, W.
18Jun-2003Statistical control of a Six Sigma processGoh, T.N. ; Xie, M. 
191997The use of probability limits for process control based on geometric distributionXie, M. ; Goh, T.N. 
201997Two-stage control charts for high yield processesChan, L.Y.; Xie, M. ; Goh, T.N.