Full Name
Marshall, Peter William
(not current staff)
Variants
Marshall, P.W.
Marshall, P.
 
Main Affiliation
 
 
Email
cvempw@nus.edu.sg
 

Publications

Results 1-20 of 22 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
12010Bond enhancement for sandwich shell ice wallMarshall, P.W. ; Palmer, A. ; Liew, J.Y.R. ; Wang, T. ; Thein, M.K.W.
2Dec-2013Brittle failure caused by lamellar splitting in a large-scale tubular joint with fatigue cracksQian, X. ; Ou, Z.; Swaddiwudhipong, S. ; Marshall, P.W. 
32012Development of composite sandwich structures for Arctic regionSohel, K.M.A. ; Liew, J.Y.R. ; Jiabao, Y.; Zhang, M.H. ; Marshall, P.W. 
42014Fatigue and residual strength of concrete-filled tubular X-joints with full capacity weldsQian, X. ; Jitpairod, K.; Marshall, P. ; Swaddiwudhipong, S.; Ou, Z.; Zhang, Y.; Pradana, M.R.
52010Fatigue performance of enhanced partial joint penetration welds for tubular jointsMarshall, P. ; Qian, X. ; Petchdemaneengam, Y.
62013Fatigue performance of tubular X-joints with PJP+ welds: I - Experimental studyQian, X. ; Petchdemaneengam, Y.; Swaddiwudhipong, S. ; Marshall, P. ; Ou, Z. ; Nguyen, C.T. 
72013Fatigue performance of tubular X-joints with PJP+ welds: I - Experimental studyQian, X. ; Petchdemaneengam, Y.; Swaddiwudhipong, S. ; Marshall, P. ; Ou, Z.; Nguyen, C.T. 
82013Fatigue performance of tubular X-joints with PJP+ welds: II - Numerical investigationQian, X. ; Nguyen, C.T. ; Petchdemaneengam, Y.; Ou, Z. ; Swaddiwudhipong, S. ; Marshall, P. 
92013Fatigue performance of tubular X-joints with PJP+ welds: II - Numerical investigationQian, X. ; Nguyen, C.T. ; Petchdemaneengam, Y.; Ou, Z.; Swaddiwudhipong, S. ; Marshall, P. 
102007How risky were my old platforms?Marshall, P.W. 
112009New life for old fields: Alternatives to abandonmentMarshall, P.W. ; Choo, Y.S. 
12May-2013Overload effect on the fatigue crack propagation in large-scale tubular jointsQian, X. ; Swaddiwudhipong, S. ; Nguyen, C.T. ; Petchdemaneengam, Y.; Marshall, P. ; Ou, Z. 
13May-2013Overload effect on the fatigue crack propagation in large-scale tubular jointsQian, X. ; Swaddiwudhipong, S. ; Nguyen, C.T. ; Petchdemaneengam, Y.; Marshall, P. ; Ou, Z.
142009Partial joint penetration plus welds for tubular joints: Fabrication and SCFsQian, X. ; Marshall, P.W. ; Cheong, W.K.D.; Yuthdanai, P.; Chen, Z.
152009Platform life extension by inspectionMarshall, P.W. ; Copanoglu, C.C.
162009RBI for fixed, mobile, and floating offshore platformsMarshall, P. ; Goldberg, L.
172012Root cracking in tubular joints with enhanced partial joint penetration weldsMarshall, P.W. ; Qian, X. ; Petchdemaneegam, Y.; Thang, C.T.
182012Root cracking in tubular joints with enhanced partial joint penetration weldsMarshall, P.W. ; Qian, X. ; Petchdemaneegam, Y.; Thang, C.T.
192011Structural concepts for dry tree wells in deep waterMarshall, P. ; Llorente, C.
202007Unzipping analysis of a full-scale offshore structure connectionQian, X. ; Marshall, P.