Full Name
Huang Huei Chuen
(not current staff)
Variants
Huang, H.C.
Huang, H.-C.
Huang, Huei Chuen
 
 
 
Email
isehhc@nus.edu.sg
 

Publications

Refined By:
Type:  Article

Results 1-20 of 48 (Search time: 0.016 seconds).

Issue DateTitleAuthor(s)
1May-2003A comparative study of metaheuristics for vehicle routing problem with stochastic demandsTeng, S. ; Ong, H.L. ; Huang, H.C. 
22009A genetic algorithm for the economic lot scheduling problem under the extended basic period and power-of-two policySun, H.; Huang, H.-C. ; Jaruphongsa, W.
31-Mar-2008A k-product uncapacitated facility location problemHuang, H.-C. ; Li, R.
41-Feb-2010A Markov model for single-leg air cargo revenue management under a bid-price policyHan, D.L.; Tang, L.C. ; Huang, H.C. 
5Jul-2002A method for evaluating the behavior of power indices in weighted plurality gamesChua, V.C.H.; Ueng, C.H.; Huang, H.C. 
61-Jul-2008A successive convex approximation method for multistage workforce capacity planning problem with turnoverSong, H. ; Huang, H.-C. 
716-Nov-2005A two-echelon inventory system with transportation capacity constraintHuang, H.C. ; Chew, E.P. ; Goh, K.H.
8Jun-2004An integer L-shaped algorithm for time-constrained traveling salesman problem with stochastic travel and service timesTeng, S.Y. ; Ong, H.L. ; Huang, H.C. 
91993Analysing a mental health survey by chi-squared automatic interaction detection.Huang, H.C. ; Lin, T.K. ; Ngui, P.W.
102000Analytical representation of probabilities under the IAC conditionHuang, H.C. ; Chua, V.C.H.
111989Asymptotic expected performance of some TSP heuristics: An empirical evaluationOng, H.L. ; Huang, H.C. 
12Sep-2006Development of timed Colour Petri net simulation models for air cargo terminal operationsLee, C.; Huang, H.C. ; Liu, B.; Xu, Z.
131984EXPECTED PERFORMANCE OF SOME LOT-SIZING HEURISTICS IN A ROLLING-SCHEDULE ENVIRONMENT.Huang, Huei Chuen ; Ong, Hoon Liong 
14Jun-2003Finding the exact volume of a polyhedronOng, H.L. ; Huang, H.C. ; Huin, W.M.
15Aug-2009Genetic algorithms for the multiple-machine economic lot scheduling problemSun, H.; Huang, H.-C. ; Jaruphongsa, W. 
16Aug-2009Genetic algorithms for the multiple-machine economic lot scheduling problemSun, H.; Huang, H.-C. ; Jaruphongsa, W. 
17Jan-2013Heuristic algorithms for general k-level facility location problemsLi, R.; Huang, H.-C. ; Huang, J.
18Jan-2013Heuristic algorithms for general k-level facility location problemsLi, R.; Huang, H.-C. ; Huang, J.
19Apr-2006Heuristic algorithms for visiting the customers in a rolling schedule environmentTeng, S.Y. ; Ong, H.L. ; Huang, H.C. 
201-Jan-2007Improved algorithm for a generalized on-line scheduling problem on identical machinesLi, R.; Huang, H.-C.