Full Name
Kim Huat, David Chua
Variants
Chua, D.K.
Chua, D.
Chua, K.H.
Chua, D.K.H.
Chua David, K.H.
Chua, David K.H.
David, C.
 
 
 
Email
ceedavid@nus.edu.sg
 
 

Publications

Results 61-80 of 94 (Search time: 0.008 seconds).

Issue DateTitleAuthor(s)
61May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
62May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
63Nov-1997Neural networks for construction project successChua, D.K.H. ; Loh, P.K.; Kog, Y.C. ; Jaselskis, E.J.
642012Optimizing concurrent execution of design activities with minimum redesignHossain, M.A.; Chua, D.K.H. ; Liu, Z. 
6529-Apr-2017Options-based negotiation management of PPP?BOT infrastructure projectsMeghdad Attarzadeh; David Chua ; Michael Beer; Ernest Abbott 
66Apr-2011PDM++: Planning framework from a construction requirements perspectiveChua, D.K.H. ; Yeoh, K.W.
67Apr-2011PDM++: Planning framework from a construction requirements perspectiveChua, D.K.H. ; Yeoh, K.W.
68May-1997Performance of urban rail transit system: Vibration and noise studyChua, D.K.H. ; Koh, C.G. ; Lo, K.W. 
69Jun-2005Poisson model of construction incident occurrenceChua, D.K.H. ; Goh, Y.M. 
702002POST: Product oriented scheduling technique for constructability analysisSong, Y. ; Chua, D.K.H. 
712012Predicting change propagation and impact on design schedule due to external changesChua, D.K.H. ; Hossain, M.A.
722012Predicting change propagation and impact on design schedule due to external changesChua, D.K.H. ; Hossain, M.A.
73Nov-2003Process-parameter-interface model for design managementChua, D.K.H. ; Tyagi, A.; Ling, S. ; Bok, S.H. 
742010Quantification of spatial temporal congestion in four-dimensional computer-aided designChua, D.K.H. ; Yeoh, K.W.; Song, Y.
752008Reduced duration of the design projects with the concept of early estimation of design tasksChua, D.K.H. ; Hossain, Md.A.
76Nov-2011Requirement and availability time-window analysis of intermediate functionSong, Y.; Chua, D.K.H. 
77Nov-2011Requirement and availability time-window analysis of intermediate functionSong, Y.; Chua, D.K.H. 
782000Resource-interacted simulation modeling in constructionChua, D.K.H. ; Li, G.M.
79May-2002RISim: Resource-interacted simulation modeling in constructionChua, D.K.H. ; Li, G.M.
802011Risk management of asalouye desalination projectAttarzadeh, M.; Chua, D.K.H. ; Beer, M.