Full Name
Kim Huat, David Chua
Variants
Chua, D.K.
Chua, D.
Chua, K.H.
Chua, D.K.H.
Chua David, K.H.
Chua, David K.H.
David, C.
 
 
 
Email
ceedavid@nus.edu.sg
 
 

Publications

Refined By:
Department:  CIVIL & ENVIRONMENTAL ENGINEERING

Results 1-20 of 24 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
1Apr-2011A simulation model to study the impact of early information on design duration and redesignChua, D.K.H. ; Hossain, M.A.
215-Oct-2011Aggregate production planning for shipbuilding with variation-inventory trade-offsLiu, Z. ; Chua, D.K.H. ; Yeoh, K.-W.
32013Automated construction sequencing and scheduling from functional requirementsChua, D.K.H. ; Nguyen, T.Q.; Yeoh, K.W.
42011Framework for an IFC-based tool for implementing design for deconstruction (DfD)Khalili, A.; Chua, D.K.H. 
51-May-2013IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabricationKhalili, A.; Chua, D.K.H. 
61-May-2013IFC-based framework to move beyond individual building elements toward configuring a higher level of prefabricationKhalili, A.; Chua, D.K.H. 
71-Feb-2014Integrated prefabrication configuration and component grouping for resource optimization of precast productionKhalili, A.; Chua, D.K. 
82012Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and riskAttarzadeh, M.; Chua, D.K.H. ; Zhu, L. ; Beer, M.
92012Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and riskAttarzadeh, M.; Chua, D.K.H. ; Zhu, L. ; Beer, M.
102012Model for negotiation of refinancing gain from public-private partnershipZhu, L. ; Chua, D.K.H. 
112012Model for negotiation of refinancing gain from public-private partnershipZhu, L. ; Chua, D.K.H. 
12May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
13May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
142012Optimizing concurrent execution of design activities with minimum redesignHossain, M.A.; Chua, D.K.H. ; Liu, Z. 
15Apr-2011PDM++: Planning framework from a construction requirements perspectiveChua, D.K.H. ; Yeoh, K.W.
16Apr-2011PDM++: Planning framework from a construction requirements perspectiveChua, D.K.H. ; Yeoh, K.W.
172012Predicting change propagation and impact on design schedule due to external changesChua, D.K.H. ; Hossain, M.A.
182012Predicting change propagation and impact on design schedule due to external changesChua, D.K.H. ; Hossain, M.A.
19Nov-2011Requirement and availability time-window analysis of intermediate functionSong, Y.; Chua, D.K.H. 
20Nov-2011Requirement and availability time-window analysis of intermediate functionSong, Y.; Chua, D.K.H.