Full Name
Kim Huat, David Chua
Variants
Chua, D.K.
Chua, D.
Chua, K.H.
Chua, D.K.H.
Chua David, K.H.
Chua, David K.H.
David, C.
 
 
 
Email
ceedavid@nus.edu.sg
 
 

Publications

Refined By:
Department:  BUILDING

Results 1-14 of 14 (Search time: 0.009 seconds).

Issue DateTitleAuthor(s)
12008An investigation of critical chain and lean project schedulingShen, L. ; Chua, D.K.H. 
22002Application of case based reasoning in construction safety planningChua, D.K.H. ; Goh, Y.M. 
3May-2003Constraint-based planning with integrated production scheduler over internetChua, D.K.H. ; Shen, L.J. ; Bok, S.H. 
42014Formalizing Construction Safety Knowledge for Intelligent BIM-Based Review of Design for Safety.Qui, N., ; Abbott, E. L. S. ; Chua, D. K. H. ; Goh Y.M. 
51-May-2002Identification of Factors Causing Fatal Construction Accidents.Goh Y.M. ; Chua D.K.H. 
62005Impact of variability on construction schedulesSHEN LIJUN ; Chua, D.K.H. 
72003Improving Safety Risk Analysis Through The Application Of Case Based Reasoning ConceptsGoh Y.M. ; Chua D.K.H. 
82004Incident causation model for improving feedback of safety knowledgeChua, D.K.H. ; Goh, Y.M. 
9Jul-2004Incident causation model for improving feedback of safety knowledgeChua, D.K.H. ; Goh, Y.M. 
102005Key constraint analysis: Achieve lean processes with the application of TOCSHEN LIJUN ; Chua, D.K.H. 
11Jul-2005Key constraints analysis with integrated production schedulerChua, D.K.H. ; SHEN LIJUN 
12May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
13May-2013Neural network analysis of construction safety management systems: a case study in SingaporeGoh, Y.M. ; Chua, D. 
14Jun-2005Poisson model of construction incident occurrenceChua, D.K.H. ; Goh, Y.M.