Full Name
Goh Thong Ngee
(not current staff)
Variants
Goh T.N.
Ngee, G.T.
Goh, T.N.
Gohc, T.N.
Xie M., He B.
Goh, T.-N.
Goh, Thongngee
 
 
 
Email
isegohtn@nus.edu.sg
 

Publications

Refined By:
Type:  Article

Results 141-157 of 157 (Search time: 0.006 seconds).

Issue DateTitleAuthor(s)
141Jun-2003Statistical control of a Six Sigma processGoh, T.N. ; Xie, M. 
142Nov-1991Statistical monitoring and control of a low defect processGoh, T.N. 
143Dec-2000Statistical monitoring and control of tool wear processesXie, M. ; Goh, T.N. ; Wiklund, H.; Tang, X.Y.
1441999Statistical techniques for qualityXie, M. ; Goh, T.N. 
145Sep-1994Taguchi methods in practice: an analysis of Goh's paradoxGoh, T.N. 
146May-1993Taguchi methods: Some technical, cultural and pedagogical perspectivesGoh, T.N. 
147Jun-2002The role of statistical design of experiments in Six Sigma: Perspectives of a practitionerGoh, T.N. 
1481997The use of probability limits for process control based on geometric distributionXie, M. ; Goh, T.N. 
149Oct-2010Three-level and mixed-level orthogonal arrays for lean designsMa, C.-X.; Ai, M.-Y.; Chan, L.Y.; Goh, T.N. 
150Oct-2010Three-level and mixed-level orthogonal arrays for lean designsMa, C.-X.; Ai, M.-Y.; Chan, L.Y.; Goh, T.N. 
151Jan-2011Two MEWMA charts for gumbel's bivariate exponential distributionXie, Y.; Xie, M. ; Goh, T.N. 
152Jan-2011Two MEWMA charts for gumbel's bivariate exponential distributionXie, Y.; Xie, M. ; Goh, T.N. 
1531997Two-stage control charts for high yield processesChan, L.Y.; Xie, M. ; Goh, T.N. 
1541998Use of dummy values in analyzing incomplete experimental design dataGoh, T.N. 
1551998Use of dummy values in analyzing incomplete experimental design dataGoh, T.N. 
15628-Dec-2001Zero-inflated poisson model in statistical process controlXie M., He B. 
15728-Dec-2001Zero-inflated poisson model in statistical process controlXie M., He B.