CHEMICAL & BIOMOLECULAR ENGINEERING

Organization name
CHEMICAL & BIOMOLECULAR ENGINEERING


Results 1521-1540 of 7500 (Search time: 0.022 seconds).

Issue DateTitleAuthor(s)
1521Jul-2006Seeding and constant-supersaturation control by ATR-FTIR in anti-solvent crystallizationYu, Z.Q.; Chow, P.S.; Tan, R.B.H. 
15221-Jul-2010Seed-mediated synthesis of monodisperse concave trisoctahedral gold nanocrystals with controllable sizesYu, Y.; Zhang, Q. ; Lu, X. ; Lee, J.Y. 
1523Jun-1998Secondary ionic forces in lead molybdate melt solidificationZeng, H.C. ; Lim, L.C. 
15242009Secondary flow behavior in a double bifurcationLeong, F.Y.; Smith, K.A.; Wang, C.-H. 
15252005Secondary flow behavior and particle transport in bifurcationsLeong, F.Y.; Smith, K.A.; Wang, C.-H. 
152615-Mar-2018SEAWATER DESALINATION BY FREEZE DESALINATION AND MEMBRANE DISTILLATIONCHANG JIAN
152714-Aug-2008Screening for cocrystallization tendency: The role of intermolecular interactionsHe, G.; Jacob, C.; Guo, L.; Chow, P.S.; Tan, R.B.H. 
15281-Jan-2004SCR of lean NOx with C3H8 over Co/MFI catalysts: Dependence on synthesis condition of MFI and Co locationChen, X.-Y.; Shen, S.-C. ; Chen, H.-H. ; Kawi, S. 
15299-Apr-2006Scheduling transshipment operations in maritime chemical transportationHUANG CHENG
153015-Mar-2006Scheduling trans-shipment operations in maritime chemical transportationHuang, C.; Karimi, I.A. 
153122-Nov-2006Scheduling tanker-lightering operations in crude oil transportationHuang, C.; Karimi, I.A. 
1532Jan-2005Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M.; Mahalingam, H. 
15332004Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M. ; Mahalingam, H.
15342004Scheduling tank container movements for chemical logisticsKarimi, I.A. ; Sharafali, M.; Mahalingam, H. 
153520-Feb-2002Scheduling parallel production lines with resource constraints. 2. Decomposition algorithmLamba, N.; Karimi, I.A. 
153620-Feb-2002Scheduling parallel production lines with resource constraints. 1. Model formulationLamba, N.; Karimi, I.A. 
153729-Aug-2014Scheduling of unloading, inventory and delivery operations at an LNG receiving terminalRAJNISH KUMAR
153820-Apr-2005Scheduling of single-stage noncontinous processesBALLA GANESH
153919-Mar-2005Scheduling of serial multiproduct batch processesSURESH PITTY SIVANANDAM
154030-May-2007Scheduling of multi-stage multi-product batch plants with parallel unitsLIU YU