Browsing by Department INDUSTRIAL & SYSTEMS ENGINEERING

Select a letter below to start browsing or type
0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z


Showing results 1285 to 1304 of 1595 < previous   next >
Issue DateTitleAuthor(s)
2015(s, S) policy model for liner shipping refueling and sailing speed optimization problemSheng, Xiaoming; Chew, Ek Peng ; Lee, Loo Hay 
2000Scheduling MEMS manufacturingLixin, Wang; Hock, Francis Tay Eng ; Hay, Lee Loo 
2000Scheduling MEMS manufacturingTay, Francis E.H. ; Hay, Lee Loo ; Lixin, Wang
13-Sep-2016SECOND-ORDER IMPRECISE STOCHASTIC DOMINANCEYUAN YUHE
Jul-1992Sector disaggregation and the effect of structural change on industrial energy consumptionAng, B.W. ; Liu, X.Q.; Ong, H.L. 
Jul-1992Sector disaggregation and the effect of structural change on industrial energy consumptionAng, B.W. ; Liu, X.Q.; Ong, H.L. 
Oct-1993Sector disaggregation, structural effect and industrial energy use: An approach to analyze the interrelationshipsAng, B.W. 
Oct-1993Sector disaggregation, structural effect and industrial energy use: An approach to analyze the interrelationshipsAng, B.W. 
1999Selecting the most reliable population under step-stress accelerated life testTang, L.C. ; Sun, Y.
1999Selecting the most reliable population under step-stress accelerated life testTang, L.C. ; Sun, Y.
16-Sep-2010Semiconductor lot allocation using robust optimizationNg, T.S. ; Sun, Y.; Fowler, J.
16-Sep-2010Semiconductor lot allocation using robust optimizationNg, T.S. ; Sun, Y.; Fowler, J.
2007Semiconductor production planning using robust optimizationNg, T.S. ; Fowler, J.
2007Semiconductor production planning using robust optimizationNg, T.S. ; Fowler, J.
Nov-2010Sensitivity analysis of release time of software reliability models incorporating testing effort with multiple change-pointsLi, X.; Xie, M. ; Ng, S.H. 
Nov-2010Sensitivity analysis of release time of software reliability models incorporating testing effort with multiple change-pointsLi, X.; Xie, M. ; Ng, S.H. 
1999Sensitivity of the relationship matrix in quality function deploymentShen, X.X.; Tan, K.C. ; Xie, M. ; Goh, T.N. ; Wang, H. 
16-May-2004Sequential inspection strategy for multiple systems under availability requirementCui, L.R. ; Loh, H.T. ; Xie, M. 
16-May-2004Sequential inspection strategy for multiple systems under availability requirementCui, L.R. ; Loh, H.T. ; Xie, M. 
28-Jul-2010Service innovation in bottom of the pyramid marketsUSMAN ASAD