Browsing by Author LEE CHUL-UNG

Showing results 1 to 11 of 11
Issue DateTitleAuthor(s)
2004A make-to-stock production system with an emergency production rateJaruphongsa, W. ; Lee, C. ; Lin, W.
16-Mar-2007A multi-objective genetic algorithm for robust flight scheduling using simulationLee, L.H. ; Lee, C.U. ; Tan, Y.P.
2003Discrete event simulation model for airline operations: SIMAIRLee, L.H. ; Huang, H.C. ; Lee, C. ; Chew, E.P. ; Jaruphongsa, W. ; Yong, Y.Y. ; Liang, Z.; Leong, C.H. ; Tan, Y.P.; Namburi, K. ; Johnson, E.; Banks, J.
16-Oct-2006Inventory control in the presence of an electronic marketplaceLee, L.H. ; Lee, C. ; Bao, J.
16-Oct-2006Inventory control in the presence of an electronic marketplaceLee, L.H. ; Lee, C. ; Bao, J.
20-Nov-2001Optimal dwell point location of automated guided vehicles to minimize mean response time in a loop layoutLee, C. ; Ventura, J.A.
20-Nov-2001Optimal dwell point location of automated guided vehicles to minimize mean response time in a loop layoutLee, C. ; Ventura, J.A.
Aug-2003Optimally locating multiple dwell points in a single loop guide path systemVentura, J.A.; Lee, C. 
Aug-2003Optimally locating multiple dwell points in a single loop guide path systemVentura, J.A.; Lee, C. 
Apr-2004Product location, allocation and server home base location for an order picking line with multiple serversJewkes, E.; Lee, C. ; Vickson, R.
Apr-2004Product location, allocation and server home base location for an order picking line with multiple serversJewkes, E.; Lee, C. ; Vickson, R.