Please use this identifier to cite or link to this item:
https://doi.org/10.1109/WSC.2006.322957
Title: | A simulation-ga based model for production planning in precast plant | Authors: | Zhai, X. Tiong, R.L.K. Bjornsson, H.C. Chua, D.K.H. |
Issue Date: | 2006 | Citation: | Zhai, X., Tiong, R.L.K., Bjornsson, H.C., Chua, D.K.H. (2006). A simulation-ga based model for production planning in precast plant. Proceedings - Winter Simulation Conference : 1796-1803. ScholarBank@NUS Repository. https://doi.org/10.1109/WSC.2006.322957 | Abstract: | Planning plays an important role in precast production management. In practice, however, this work is primarily carried out on a rule-of-thumb basis. A specialized planning model based on simulation technique and genetic algorithm (GA) is presented in this paper for make-to-order precast production. A novel priority rule, the critical precast component (CP) rule, is established for mold considerations during simulation, and a bi-directional simulation is adopted to reduce excessive overtime and precast stock. On this basis, three simulation approaches are designed using different simulation heuristics and directions. To test the validity of the proposed model with different approaches, a planning experiment is carried out. By comparison, it is clear that the Simulation-GA based model using CP rule and bi-directional simulation can generate a satisfying resource plan and production schedule. © 2006 IEEE. | Source Title: | Proceedings - Winter Simulation Conference | URI: | http://scholarbank.nus.edu.sg/handle/10635/74039 | ISBN: | 1424405017 | ISSN: | 08917736 | DOI: | 10.1109/WSC.2006.322957 |
Appears in Collections: | Staff Publications |
Show full item record
Files in This Item:
There are no files associated with this item.
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.