Please use this identifier to cite or link to this item: https://doi.org/10.1080/03052150903406571
Title: Integrated discrete berth allocation and quay crane scheduling in port container terminals
Authors: Lee, D.-H. 
Qiu Wang, H.
Keywords: berth allocation
port operation
quay crane scheduling
Issue Date: Aug-2010
Citation: Lee, D.-H., Qiu Wang, H. (2010-08). Integrated discrete berth allocation and quay crane scheduling in port container terminals. Engineering Optimization 42 (8) : 747-761. ScholarBank@NUS Repository. https://doi.org/10.1080/03052150903406571
Abstract: The integrated discrete berth allocation and quay crane scheduling problem studied in this article considers the relationship between them. This article provides a mixed integer programming model for the studied problem that is NP-complete in nature. A genetic algorithm is proposed to obtain near optimal solutions. Computational experiments are conducted to examine the proposed solution algorithm. The computational results show that the proposed genetic algorithm is effective and efficient in solving the studied problem. © 2010 Taylor & Francis.
Source Title: Engineering Optimization
URI: http://scholarbank.nus.edu.sg/handle/10635/65721
ISSN: 0305215X
DOI: 10.1080/03052150903406571
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

SCOPUSTM   
Citations

21
checked on Jul 16, 2018

WEB OF SCIENCETM
Citations

11
checked on May 28, 2018

Page view(s)

32
checked on Jun 29, 2018

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.