Please use this identifier to cite or link to this item: http://scholarbank.nus.edu.sg/handle/10635/46399
Title: Consultant cost control in the Pacific rim
Authors: Betts, Martin 
Gunner, John
Issue Date: 1992
Source: Betts, Martin,Gunner, John (1992). Consultant cost control in the Pacific rim. Cost Engineering (Morgantown, West Virginia) 34 (1) : 17-24. ScholarBank@NUS Repository.
Abstract: This article describes the system of consultant cost control used by this organization and evaluates it in the context of a case study project. The project is a new administrative and educational building for a management institute to hold courses and seminars for its members. The cost control system has limitations in the extent to which it allows total cost management at the design and construction stages. The article describes these limitations and suggests how the system and its operation could be improved.
Source Title: Cost Engineering (Morgantown, West Virginia)
URI: http://scholarbank.nus.edu.sg/handle/10635/46399
ISSN: 02749696
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Page view(s)

49
checked on Dec 8, 2017

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.