Please use this identifier to cite or link to this item: https://doi.org/10.1016/j.buildenv.2004.02.008
Title: Using neural network to predict performance of design-build projects in Singapore
Authors: Ling, F.Y.Y. 
Liu, M.
Keywords: Artificial neural network
Critical success factors
Design-build
Key determinants
Project performance
Issue Date: 2004
Source: Ling, F.Y.Y., Liu, M. (2004). Using neural network to predict performance of design-build projects in Singapore. Building and Environment 39 (10) : 1263-1274. ScholarBank@NUS Repository. https://doi.org/10.1016/j.buildenv.2004.02.008
Abstract: Design-build (DB) project success may be operationalised into 11 performance metrics. 65 factors that may affect DB project success are identified. Using data from 33 DB projects, correlation analysis shows that there are several factors that affect each performance metric significantly. Artificial neural network (ANN) technique is used to construct the models to predict project performance, and these models are tested using data from five new projects. This study finds that six performance metrics can be predicted with a reasonable degree of accuracy: project intensity; construction and delivery speeds; turnover, system and equipment quality. The key variables that affect project performance may be attributed to both contractors and clients. To ensure project success, contractors should have adequate staffing level, a good track record for completion on budget, and ability in financial management and quality control. Consultants should have a high level of construction sophistication, and have handled DB projects in the past. Clients also play an important part in ensuring DB project success. They would need to have construction experience and handled DB projects in the past. In addition, they should decide on the optimal level of design completion when the budget is fixed and tenders are invited. It is recommended that owners and contractors take note of the factors identified in this study, which significantly affect DB project performance. © 2004 Elsevier Ltd. All rights reserved.
Source Title: Building and Environment
URI: http://scholarbank.nus.edu.sg/handle/10635/45894
ISSN: 03601323
DOI: 10.1016/j.buildenv.2004.02.008
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

SCOPUSTM   
Citations

49
checked on Dec 7, 2017

WEB OF SCIENCETM
Citations

44
checked on Nov 23, 2017

Page view(s)

92
checked on Dec 11, 2017

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.