Please use this identifier to cite or link to this item: https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(626)
DC FieldValue
dc.titleReliability buffering for construction projects
dc.contributor.authorPark, M.
dc.contributor.authorPeña-Mora, F.
dc.date.accessioned2013-10-14T04:41:08Z
dc.date.available2013-10-14T04:41:08Z
dc.date.issued2004
dc.identifier.citationPark, M., Peña-Mora, F. (2004). Reliability buffering for construction projects. Journal of Construction Engineering and Management 130 (5) : 626-637. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:5(626)
dc.identifier.issn07339364
dc.identifier.urihttp://scholarbank.nus.edu.sg/handle/10635/45819
dc.description.abstractBuffering is a common practice in project planning. Project managers or schedulers have used a time contingency to guarantee the completion time of either an activity or a project. This traditional buffering, however, often fails to protect the project schedule performance, resulting in an unnecessary resource idle time. To deal with this problem, reliability buffering, a simulation-based buffering strategy, is presented. Reliability buffering aims to generate a robust construction plan that protects against uncertainties by reducing the potential impact of construction changes. The effectiveness of reliability buffering is examined by simulating a dynamic project model that integrates the simulation approach with the network scheduling approach. The research results indicate that reliability buffering can help achieve a shorter project duration without driving up costs by pooling, resizing, relocating, and recharacterizing contingency buffers. A case study of bridge construction projects also demonstrates how construction projects can benefit from reliability buffering in real world settings. Although further validation is needed, reliability buffering can potentially impact the planning and control of construction projects by improving the consideration of construction feedbacks and characteristics in buffering, and serving as an input to a dynamic project model.
dc.description.urihttp://libproxy1.nus.edu.sg/login?url=http://dx.doi.org/10.1061/(ASCE)0733-9364(2004)130:5(626)
dc.sourceScopus
dc.subjectBuffeting
dc.subjectConstruction management
dc.subjectProject management
dc.subjectReliability
dc.subjectSimulation
dc.typeArticle
dc.contributor.departmentBUILDING
dc.description.doi10.1061/(ASCE)0733-9364(2004)130:5(626)
dc.description.sourcetitleJournal of Construction Engineering and Management
dc.description.volume130
dc.description.issue5
dc.description.page626-637
dc.description.codenJCEMD
dc.identifier.isiut000224654500002
Appears in Collections:Staff Publications

Show simple item record
Files in This Item:
There are no files associated with this item.

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.