Title: Assessment of defects at construction and occupancy stages
Authors: Chong, W.-K.
Low, S.-P. 
Keywords: Building design
Construction inspection
Construction materials
Defects
Maintenance
Quality control
Issue Date: 2005
Source: Chong, W.-K., Low, S.-P. (2005). Assessment of defects at construction and occupancy stages. Journal of Performance of Constructed Facilities 19 (4) : 283-289. ScholarBank@NUS Repository. https://doi.org/10.1061/(ASCE)0887-3828(2005)19:4(283)
Abstract: Construction inspection can take place only during the construction phase of a project. This imposes limitations on what the building inspector can detect, and thus there is often a gap between perceived construction quality and the defects the occupants suffer from later. This research paper looks into the differences among the defects that occurred during construction and 2 to 6 years after initial occupancy and finds that the defects at both periods were very different. Defects found during the occupancy stage are commonly known as latent defects, most of which were rarely found during the construction stage and are thus rarely accounted for by the designers and building developers. This paper confirms the need to look at defects in another way and to establish more effective methods to reduce latent defects. © ASCE.
Source Title: Journal of Performance of Constructed Facilities
URI: http://scholarbank.nus.edu.sg/handle/10635/45577
ISSN: 08873828
DOI: 10.1061/(ASCE)0887-3828(2005)19:4(283)
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

SCOPUSTM   
Citations

25
checked on Dec 14, 2017

WEB OF SCIENCETM
Citations

22
checked on Nov 18, 2017

Page view(s)

69
checked on Dec 10, 2017

Google ScholarTM

Check

Altmetric


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.