Title: Replanning the master production schedule for a capacity-constrained job shop
Authors: Kum Khiong, Y. 
Jacobs, F.R.
Keywords: Job Shop Scheduling
Master Production Scheduling
Repetitive Manufacturing
Simulation
Issue Date: 1999
Source: Kum Khiong, Y.,Jacobs, F.R. (1999). Replanning the master production schedule for a capacity-constrained job shop. Decision Sciences 30 (3) : 719-748. ScholarBank@NUS Repository.
Abstract: This research examines the use of both frozen and replanning intervals for planning the master production schedule (MPS) for a capacity-constrained job shop. The results show that forecast error, demand lumpiness, setup time, planned lead time, and order size have a greater impact on the mean total backlog, total inventory, and number of setups than the frozen and replanning intervals. The study also shows that a repetitive lot dispatching rule reduces the importance of lot sizing, and a combination of repetitive lot dispatching rule and single-period order size consistently produces the lowest mean total backlog and total inventory. The results also indicate that rescheduling the open orders every period produces a lower mean total backlog and total inventory when the forecast errors are large relative to the order sizes. This result suggests that the due date of an open order should be updated only when a significant portion of the order is actually needed on the new due date.
Source Title: Decision Sciences
URI: http://scholarbank.nus.edu.sg/handle/10635/45024
ISSN: 00117315
Appears in Collections:Staff Publications

Show full item record
Files in This Item:
There are no files associated with this item.

Page view(s)

82
checked on Dec 8, 2017

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.