Please use this identifier to cite or link to this item: http://scholarbank.nus.edu.sg/handle/10635/15724
Title: Optimizing yard crane operations in port container terminals
Authors: CAO ZHI
Keywords: Transportation, Logistics, Yard crane, Quay crane, Container terminal, Heuristic algorithm
Issue Date: 1-Jan-2007
Source: CAO ZHI (2007-01-01). Optimizing yard crane operations in port container terminals. ScholarBank@NUS Repository.
Abstract: This thesis focuses on one of the critical aspects of the container terminal operations, the scheduling problem of yard cranes. A simplified multiple yard crane scheduling problem, two yard crane scheduling problem, is first studied as a preliminary work. Based on that, the typical multiple yard crane scheduling problem is then intensively studied. Subsequently, the results is extended to two problems derived from the standard multiple yard crane scheduling problem, the scheduling of multiple yard cranes in terminals with buffer areas and the deployment of double rail mounted gantry cranes in yard truck based terminals. In the end a study on the simultaneous scheduling problem of quay crane and yard crane is presented. All these problems are successively formulated by mathematical models. Several solution techniques are developed for the problem solution.
URI: http://scholarbank.nus.edu.sg/handle/10635/15724
Appears in Collections:Ph.D Theses (Open)

Show full item record
Files in This Item:
File Description SizeFormatAccess SettingsVersion 
CAO ZHI_PhD_Dissertation_HT030696X.pdf2.35 MBAdobe PDF

OPEN

NoneView/Download

Page view(s)

264
checked on Dec 11, 2017

Download(s)

190
checked on Dec 11, 2017

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.