Full Name
Nee Yeh Ching,Andrew
(not current staff)
Variants
NEE, YEH CHING ANDREW
Nee, A.Y.-C.
Nee, A.Y.
Nee, A.Y.C.
Maung-Maung-Thwin
Nee, Andrew Yeh-Ching
Nee, A.Y.C
Andrew, N.Y.C.
 
Main Affiliation
 
 
Email
mpeneeyc@nus.edu.sg
 

Refined By:
Author:  Nee, A.Y.C.
Author:  Fuh, J.Y.H.
Type:  Article
Date Issued:  [2000 TO 2009]

Results 1-20 of 20 (Search time: 0.005 seconds).

Issue DateTitleAuthor(s)
110-Sep-2000A computer-aided EDM electrode design system for mold manufacturingDing, X.M.; Fuh, J.Y.H. ; Lee, K.S. ; Zhang, Y.F. ; Nee, A.Y.C. 
22007A hybrid parting method based on iterative surface growth algorithm and geometric mouldabilityZhiqiang, Z.; Fuh, J.Y.H. ; Nee, A.Y.C. 
3Jun-2003A modified genetic algorithm for distributed scheduling problemsJia, H.Z. ; Nee, A.Y.C. ; Fuh, J.Y.H. ; Zhang, Y.F. 
42003A Multi-Agent-Based Agile Scheduling Model for a Virtual Manufacturing EnvironmentZhou, Z.D.; Wang, H.H.; Chen, Y.P.; Ai, W.; Ong, S.K. ; Fuh, J.Y.H. ; Nee, A.Y.C. 
520-Aug-2003A Windows-native 3D plastic injection mold design systemKong, L.; Fuh, J.Y.H. ; Lee, K.S. ; Liu, X.L.; Ling, L.S.; Zhang, Y.F. ; Nee, A.Y.C. 
6Apr-2004An adaptive and upgradable agent-based system for coordinated product development and manufactureJia, H.Z. ; Ong, S.K. ; Fuh, J.Y.H. ; Zhang, Y.F. ; Nee, A.Y.C. 
7Nov-2006An agent-based distributed manufacturing systemLi, J.; Fuh, J.Y.H. ; Zhang, Y.F. ; Nee, A.Y.C. 
8Dec-2005Application of genetic algorithm to computer-aided process planning in distributed manufacturing environmentsLi, L. ; Fuh, J.Y.H. ; Zhang, Y.F. ; Nee, A.Y.C. 
92000Automatic initial design of injection mouldYe, X.G. ; Lee, K.S. ; Fuh, J.Y.H. ; Zhang, Y.F. ; Nee, A.Y.C. 
10Jan-2002Concurrent process planning and scheduling in distributed virtual manufacturingWu, S.H.; Fuh, J.Y.H. ; Nee, A.Y.C. 
1110-Jan-2001Core and cavity generation method in injection mould designFu, M.W.; Fuh, J.Y.H. ; Nee, A.Y.C. 
12Aug-2004Feature-based design in a distributed and collaborative environmentLi, W.D.; Ong, S.K. ; Fuh, J.Y.H. ; Wong, Y.S. ; Lu, Y.Q.; Nee, A.Y.C. 
132000Integrated condition monitoring and fault diagnosis for modern manufacturing systemsZhou, Z.D.; Chen, Y.P.; Fuh, J.Y.H. ; Nee, A.Y.C. 
14Sep-2007Integration of genetic algorithm and Gantt chart for job shop scheduling in distributed manufacturing systemsJia, H.Z. ; Fuh, J.Y.H. ; Nee, A.Y.C. ; Zhang, Y.F. 
15Oct-2004Modeling, analysis, and verification of optimal fixturing designTan, E.Y.T.; Kumar, A.S. ; Fuh, J.Y.H. ; Nee, A.Y.C. 
16Jan-2009Reducing tardy jobs by integrating process planning and scheduling functionsWang, J.; Zhang, Y.F. ; Nee, A.Y.C. ; Wang, Y.F.; Fuh, J.Y.H. 
17May-2002The application of surface visibility and moldability to parting line generationFu, M.W.; Nee, A.Y.C. ; Fuh, J.Y.H. 
18Aug-2003Tool path regeneration for mold design modificationZhang, L.P.; Fuh, J.Y.H. ; Nee, A.Y.C. 
19Jun-2007Towards a generic distributed and collaborative digital manufacturingMahesh, M. ; Ong, S.K. ; Nee, A.Y.C. ; Fuh, J.Y.H. ; Zhang, Y.F. 
20Mar-2002Web-based multi-functional scheduling system for a distributed manufacturing environmentJia, H.Z. ; Fuh, J.Y.H. ; Nee, A.Y.C. ; Zhang, Y.F.