Browsing by Author KARIMI,IFTEKHAR ABUBAKAR

Select a letter below to start browsing or type
0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z


Showing results 1 to 20 of 278  next >
Issue DateTitleAuthor(s)
2004A comparison of continuous-time models for scheduling noncontinuous plantsSivanandam, S.P.; Balla, G.; Sundaramoorthy, A.; Karimi, I.A. 
2012A Comparison Study of Adjoint-Based Gradient Search Technique and Mathematical Programming for Optimal Well-PlacementToh, R.Y.; Tavallali, M.S.; Leow, W.X.; Karimi, I.A. 
2004A continuous-time formulation for scheduling multi-stage multi-product batch plants with identical parallel unitsYu, L.; Karimi, I.A. 
2005A continuous-time formulation for scheduling multi-stage multi-product batch plants with non-identical parallel unitsLiu, Y.; Karimi, I.A. 
2005A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slotsSundaramoorthy, A.; Karimi, I.A. ; Yu, L.; Srinivasan, R. 
2014A genome-scale metabolic model of Methanococcus maripaludis S2 for CO 2 capture and conversion to methaneGoyal, N.; Widiastuti, H.; Karimi, I.A. ; Zhou, Z.
2004A heuristic reactive scheduling strategy for recovering from refinery supply chain disruptionsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2004A heuristic reactive scheduling strategy for recovering from refinery supply chain disruptionsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2005A holistic approach for portfolio selection and resource-constrained scheduling of multi-task projectsViswanathan, P.K.; Karimi, I.A. ; Sundaramoorthy, A.
Jul-2011A linear diversity constraint - Application to scheduling in microgridsNaraharisetti, P.K. ; Karimi, I.A. ; Anand, A. ; Lee, D.-Y. 
2005A model-based disruption management strategy for distributed supply chainsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2005A model-based disruption management strategy for distributed supply chainsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
May-2007A model-based rescheduling framework for managing abnormal supply chain eventsAdhitya, A.; Srinivasan, R. ; Karimi, I.A. 
2006A multi-agent approach to supply chain management in the chemical industrySrinivasan, R. ; Bansal, M. ; Karimi, I.A. 
2009A multi-grid scheduling model for integrated gasoline blending operationsLi, J. ; Karimi, I.A. 
Mar-2004A new continuous-time formulation for scheduling crude oil operationsReddy, P.C.P.; Karimi, I.A. ; Srinivasan, R. 
Jul-2010A novel approach to scheduling multipurpose batch plants using unit-slotsSusarla, N.; Li, J. ; Karimi, I.A. 
Jul-2007A novel CDU model for refinery planningLi, W.; Hui, C.-W.; Karimi, I.A. ; Srinivasan, R. 
2008A novel continuous-time formulation for short-term scheduling of continuous processesLi, J. ; Susarla, N.; Karimi, I.A. 
2008A novel continuous-time formulation for short-term scheduling of continuous processesLi, J. ; Susarla, N.; Karimi, I.A.